Paste a prototype. Keystone writes the spec, asks you only the questions that matter, and turns your answers into tickets, a launch kit and a build plan a coding agent ships from.
For years the PM was a relay station.
Idea in. Docs out. Then wait.
Wait for design. Wait for engineering. Wait for the spec to be read.
Then prototypes got cheap.
An afternoon in Lovable and the thing exists.
But the spec, the tickets, the edge cases, the launch, the build plan —
that part still took weeks.
Not anymore.
Keystone does the rest. One PM with Keystone puts out what used to take a team, and every artifact traces back to a decision you made.
Every stage runs on its own except one. The stage in blue is yours.
Every screen and state, on desktop and mobile. It fills the forms, and it never clicks delete, pay or send.
Empty, loading, failure, validation, undo, mobile. The states nobody prototypes get found by rules, not by vibes.
Every requirement is tagged. A quote that isn't word for word on screen gets the requirement downgraded.
Each comes with 3–4 likely answers. One click. Anything an answer contradicts gets rewritten.
Regenerated from the decided spec, so nothing in them argues with what you chose.
Context, waves and blockers, written for Claude Code or Cursor and dropped straight into your repo.
The arch is waiting for its keystone. Pick an answer.
Paste one prompt into your coding agent. It builds the ready tickets in order, one subagent each, runs your tests, merges what passes and retries a failure once.
The crawler skips delete, pay, send, publish and logout, and it never leaves your prototype's site.
Every quote in the spec has to appear word for word in the capture. If it doesn't, the requirement is downgraded.
Coding agents build tickets literally, so a false gap becomes a false feature. Gap rules stay strict for that reason.
The handoff states what not to build, and the agent stops if a ticket crosses that line.
Paste a Lovable (or any) URL, localhost included.
Start from a written brief or an old PRD.
Start from one sentence.
Before the build and after it ships.